




|
INSTALLATION PROCEDURE: ROOFING
This serves as a guide to a typical roofing installation. Your project may vary depending upon the specific work contracted.
- You will receive a call from the front office to receive a start date for your project.
- If you have any valuables hanging on your walls, please take care to remove them as they may become unstable in the construction process.
- Remove existing shingles down to the plywood, inspect for rotted wood and replace at $3.00 per square foot, $4.00 per square foot for FRT (Fire Retardant Plywood).
- Furnish and install Drip edge at the perimeter to prevent water penetration.
- Install Ice and Water Shield at the starter course to prevent ice damming.
- Install New shingles over felt paper.
- Install Ridge vent system from peak to peak on all ridges. Unless, not needed due to other attic ventilation system.
- Flash where necessary using non-corrosive flashing products.
- Replace all vent stack collars.
- Clean up and haul away all job related debris.
- NOVA Exteriors offers a 10 year workmanship warranty.
|
|